Volume & Issue no: Volume 3, Issue 4, July - August 2014
____________________________________________________________________________________________________
Title: |
ILEACH- AN INTEGRATED LEACH ROUTING PROTOCOL FOR ELONGATING THE NETWORK LIFETIME FOR WSN |
Author Name: |
UMAPATHI G R, ALAKESH BARMAN, Dr. RAMESH BABU H S |
Abstract: |
Abstract
The Wireless Sensor Network (WSN) is composed of a
collection of sensor nodes, which are small and energy
constrained device. The efficient use of energy source in a
sensor node is most desirable criteria for prolong the life time
of wireless sensor network. So designing efficient routing for
reducing energy consumption is the important factor. In this
paper, we propose an effective version of LEACH routing
protocol, ILEACH which will extend the performance of the
system by extending the network lifetime by modifying the
threshold equation for selecting the cluster head (CH) for
every round of clustering. We experimentally showed that our
proposed mechanism give better network performance in terms
of lifetime and less amount of power consumption in the
network. We also showed a situation of critical packet delivery
and able to get less delay for critical packet delivery to the base
station (BS) directly with a differential routing approach. We
stated our future work for extending our research work.
Keywords: Wireless Sensor Network, LEACH, ILEACH, energy
efficiency, network delay |
Cite this article: |
UMAPATHI G R, ALAKESH BARMAN, Dr. RAMESH BABU H S , "
ILEACH- AN INTEGRATED LEACH ROUTING PROTOCOL FOR ELONGATING THE NETWORK LIFETIME FOR WSN" , International Journal of Emerging Trends & Technology in Computer Science (IJETTCS) ,
Volume 3, Issue 4, July - August 2014 , pp.
220-225 , ISSN 2278-6856.
|
Full Text [PDF] Back to Current Issue |
NOTE: Authors note that paper cannot be withdrawn at any condition once it is accepted. The Team of IJETTCS advise you, do not submit same article to the multiple journals simultaneously. This may create a problem for you. Please wait for review report which will take maximum 01 to 02 week.